Decking calculator. Enter deck length and width, board width, the gap between boards, board length, joist spacing, and waste. It estimates boards to order, face screws, and joists. A materials count, not a structural design.

How far each board runs, from one end of the deck to the other.

The distance from the first board row to the last.

Actual face width. A 5/4×6 or 2×6 is usually 5.5 in, and a 2×4 is 3.5 in.

Space between boards. 1/8 in is 0.125. Use 0 for a tight butt joint.

The stock length you will buy. A row longer than this uses more than one board.

10% is a common allowance. Use 5% for a simple rectangle and 15% when there are many cuts.

On-center spacing. 16 in is common. 12 in is tighter, and 24 in is only for some decking.

Two face screws at each joist, or one hidden fastener clip.

Decking estimate

Deck area
192 sq ft
Board rows
26
Boards to order
29
Linear feet to order
464 ft
Joists
13
Each joist
12 ft
Joist linear feet
156 ft
Screws or clips
676

144 in across + 0.125 in gap, divided by 5.625 in, rounds up to 26 rows. Each row needs 1 board of 16 ft, so 26 boards before waste. 10% waste rounds that up to 29 boards. Joists: ceil(192 / 16) + 1 = 13. Screws: 26 × 13 × 2 = 676.

Waste is added after whole boards are counted. Screws cover the installed rows, not the spare boards. Rim boards, beams, posts, and a ledger are not included. This is a materials count, not a structural design. The math stays in your browser.

How to use

  1. Enter how far the boards run and the distance across the boards, both in feet.
  2. Enter the board face width and the gap, in inches. A 5/4×6 is usually 5.5 in wide, and 1/8 in is 0.125.
  3. Enter the stock board length, the waste percent, and the joist spacing on center.
  4. Choose 2 face screws or 1 hidden fastener at each joist, then read the boards, screws, and joists.

Formula

Rows = ceil((width in inches + gap) / (board width + gap)), so the last board has no gap after it. Pieces per row = ceil(board run / stock length). Boards to order = ceil(rows × pieces per row × (1 + waste / 100)). Joists = ceil(board run in inches / spacing) + 1, including both ends. Screws = rows × joists × fasteners per crossing. Screws cover the installed rows, not the waste boards.

Example. A deck with boards running 16 ft and 12 ft across, using 5.5 in boards, a 0.125 in gap, 16 ft stock, 10% waste, 16 in joists, and 2 screws, needs 26 rows, 29 boards, 13 joists (156 ft), and 676 screws. The area is 192 sq ft.

Example. A 10 ft by 10 ft deck with 3.5 in boards, a 0.25 in gap, 8 ft stock, 15% waste, 12 in joists, and 2 screws needs 33 rows, 2 boards per row, 76 boards after waste, 11 joists, and 726 screws.

What this count leaves out

Rim boards, beams, posts, footings, and a ledger are not in the total. Joist size and span still have to meet the decking maker's rules and the local code.

Frequently asked questions

How many deck boards do I need?

Rows are the deck width plus one gap, divided by the board width plus the gap, then rounded up. Each row uses whole stock boards. A 16 ft by 12 ft deck with 5.5 in boards, a 0.125 in gap, 16 ft boards, and 10% waste needs 26 rows and 29 boards.

How do you count deck screws?

Each installed row gets fasteners at every joist. Two face screws on that 16 ft by 12 ft deck, with joists 16 in apart, is 26 rows times 13 joists times 2, or 676 screws. Choose one fastener per joist for hidden clips.

How many joists does a deck need?

Joists run across the boards and include one at each end. Divide the board-run length by the on-center spacing, round up, and add 1. A 16 ft run at 16 in on center needs 13 joists, each 12 ft long.

What waste percent should I use?

Use 10% for a simple rectangle. Use 5% when the stock length matches the deck and cuts are few, and 15% for angles, picture framing, or many butt joints. Waste is applied after whole boards are counted, then rounded up.

Does this replace a structural plan?

No. It counts boards, screws, and joists for a rectangle. Beam size, posts, footings, ledger attachment, and span limits need a plan or a local code check. Rim boards and a ledger are not included.